- Owner
- Event Manager
- Effective date
- September 15, 2026
- Review cycle
- Every 12 months
1.Purpose
To execute the planned event on time and to standard on the day itself, with clear roles for setup, live cue calling, and breakdown.
2.Scope
Applies to the event team executing an event on the day, from setup through breakdown. Planning and vendor booking are covered by separate SOPs.
Definitions
- Run sheet
- The detailed, timed schedule of everything that must happen on event day, built during planning.
- Cue
- A specific trigger point in the run sheet, such as when to start music or bring out a speaker, called live by the event lead.
- Load-in
- The period when vendors and crew bring in and set up equipment, furniture and decor before the event starts.
3.Responsibilities
- Event Lead
- Calls cues from the run sheet, makes live decisions, and is the single point of contact for the event on the day.
- Event Coordinator
- Manages setup and breakdown tasks and communicates with vendors on-site.
- Venue Manager
- Coordinates building access, house systems and venue staff during the event.
- AV Technician
- Operates sound, lighting and audiovisual equipment during the program.
RACI matrix
| Activity | Event Lead | Event Coordinator | Venue Manager | AV Technician |
|---|---|---|---|---|
| Confirm setup against the floor plan | A | R | C | I |
| Call cues during the program | R/A | I | I | R |
| Resolve an on-site issue | R/A | R | C | C |
| Complete breakdown and load-out | A | R | C | R |
R = Responsible, A = Accountable, C = Consulted, I = Informed
4.Materials and PPE
Materials, tools and systems
- โPrinted and digital run sheet
- โVenue floor plan
- โTwo-way radios or messaging app
- โVendor contact sheet
- โSignage and table numbers
- โEvent day issue log
5.Procedure
- 5.1
Arrive ahead of load-in
Event LeadArrive before the scheduled load-in time to confirm venue access, house systems and staging areas are ready for vendors.
- 5.2
Brief the on-site team
Event LeadBrief the event coordinator, AV technician and any on-site staff on the run sheet, key cues and points of contact before load-in begins.
- 5.3
Supervise vendor load-in
Event CoordinatorDirect vendors to their setup areas per the floor plan and confirm each vendor's arrival against the vendor contact sheet.
- 5.4
Check AV and technical setup
AV TechnicianTest sound, lighting, microphones and any presentation equipment well before doors open, resolving issues with time to spare.
Checkpoint: All AV equipment is tested and working before the run sheet's doors-open time.
- 5.5
Confirm the floor plan is set
Event CoordinatorWalk the space against the floor plan to confirm tables, staging, signage and decor match what was approved, and fix any discrepancy before guests arrive.
Checkpoint: The room matches the approved floor plan before doors open to guests.
- 5.6
Hold a final pre-event huddle
Event LeadGather the on-site team shortly before doors open to review the run sheet's first cues and confirm everyone knows their role.
- 5.7
Call cues through the program
Event LeadCall each cue from the run sheet at its scheduled time, communicating with AV, catering and other vendors by radio as the program moves forward.
- 5.8
Monitor timing against the run sheet
Event LeadTrack actual timing against the run sheet throughout the event and adjust upcoming cues if the program is running early or behind.
- 5.9
Log and resolve on-site issues
Event CoordinatorLog any issue that comes up, such as a vendor delay or equipment fault, in the event day issue log and resolve it or escalate to the venue manager.
Warning: A guest safety issue, such as a blocked exit or a hazard, is addressed immediately, ahead of any other cue.
- 5.10
Coordinate the closing cues
Event LeadCall the closing cues, such as final remarks or last call, and confirm with catering and AV that closing timing lines up with the run sheet.
- 5.11
Supervise breakdown and load-out
Event CoordinatorDirect vendors through breakdown and load-out per the floor plan, checking that rented items and equipment are accounted for as they leave.
- 5.12
Complete the venue walk-through
Venue ManagerWalk the venue with the venue manager after load-out to confirm the space is clear and undamaged before releasing it.
6.Quality checks
- โAV and technical equipment is tested and working before doors open.
- โThe room matches the approved floor plan before guests arrive.
- โEvery cue on the run sheet is called within an acceptable time window.
- โThe venue walk-through after load-out finds the space clear and undamaged.
7.Records
- โCompleted run sheet with actual timing noted
- โEvent day issue log
- โVendor arrival and load-out confirmations
- โPost-event venue walk-through notes
8.KPIs
- โPercentage of cues called within the target time window
- โNumber of unresolved on-site issues per event
- โAV or technical failure incidents
- โTime to complete breakdown and load-out
9.Common mistakes
- โStarting the program without testing AV equipment first.
- โNot adjusting later cues when the program runs behind schedule.
- โLetting a vendor delay go unlogged until it becomes a bigger problem.
- โSkipping the post-event venue walk-through.
10.Revision history
| Revision | Date | Description | Reviewed by |
|---|---|---|---|
| 1.0 | September 15, 2026 | Initial release | Alexa Uskova |
This is a template. Adapt it to your organization, equipment and local regulations before use.