- Owner
- Service Operations Manager
- Effective date
- September 15, 2026
- Review cycle
- Every 12 months
1.Purpose
To make sure every scheduled HVAC preventive maintenance visit is performed to a consistent standard, catching problems before they cause a breakdown and keeping an accurate service history for each unit.
2.Scope
Applies to preventive maintenance visits on commercial and residential HVAC systems under a maintenance contract. Emergency repair calls and new equipment installation are covered by separate procedures.
Definitions
- PM visit
- A scheduled preventive maintenance visit performed on a set interval, as opposed to a repair call triggered by a reported fault.
- Refrigerant charge
- The amount of refrigerant in a system, checked against the manufacturer's specification for correct cooling performance.
- Superheat and subcooling
- Temperature readings technicians use to verify a system's refrigerant charge is correct.
- PM checklist
- The standardized task list and record used to document what was inspected, cleaned or adjusted during a visit.
3.Responsibilities
- HVAC Technician
- Performs the scheduled inspection, cleaning and testing tasks on the unit and documents findings on the PM checklist.
- Service Coordinator
- Schedules PM visits against the maintenance contract, confirms site access, and tracks completion against the annual plan.
- Service Manager
- Reviews flagged repair recommendations, approves parts orders, and handles contract-level issues.
- Facility Contact
- Grants access to mechanical rooms and rooftop units, and reviews the visit summary and recommendations.
RACI matrix
| Activity | HVAC Technician | Service Coordinator | Service Manager | Facility Contact |
|---|---|---|---|---|
| Schedule the PM visit | I | R/A | I | C |
| Perform the PM checklist onsite | R/A | I | I | I |
| Recommend and approve follow-up repairs | R | I | A | C |
| Update equipment history and next due date | R | R/A | I | - |
R = Responsible, A = Accountable, C = Consulted, I = Informed
4.Materials and PPE
Materials, tools and systems
- โPM checklist for the equipment type
- โRefrigerant gauges and digital thermometer
- โMultimeter and amp clamp
- โReplacement filters, belts and coil cleaning chemical
- โFin comb and coil brush
- โEquipment service history in the field service system
Personal protective equipment
- โSafety glasses
- โCut-resistant gloves for coil work
- โHearing protection near rooftop units
- โFall protection for rooftop access where required
5.Procedure
- 5.1
Review the PM schedule and unit history
HVAC TechnicianTechnician checks the day's route in the field service system and reviews each unit's service history and any open recommendations from the last visit before heading out.
- 5.2
Check in and confirm scope with facility contact
HVAC TechnicianTechnician checks in with the facility contact on arrival, confirms which units are included in today's visit, and gets access to mechanical rooms or the roof.
- 5.3
Inspect the unit before power-down
HVAC TechnicianTechnician visually inspects the unit for leaks, corrosion, unusual noise or vibration while it is still running, and notes the readings on the thermostat or controller.
- 5.4
Isolate power and check electrical connections
HVAC TechnicianTechnician shuts off power at the disconnect, then inspects and tightens electrical connections, contactors and capacitors, checking for signs of overheating.
Warning: Confirm the disconnect is off and verify zero voltage before touching any electrical component.
- 5.5
Clean the condenser and evaporator coils
HVAC TechnicianTechnician straightens bent fins with a fin comb and cleans the condenser and evaporator coils with the approved coil cleaner, rinsing thoroughly afterward.
- 5.6
Replace filters and inspect belts
HVAC TechnicianTechnician replaces air filters per the schedule, and inspects belts and pulleys for wear, cracking or misalignment, replacing them if needed.
- 5.7
Restore power and check refrigerant charge
HVAC TechnicianTechnician restores power, lets the system run, and checks superheat and subcooling readings against the manufacturer's specification to confirm the refrigerant charge is correct.
Checkpoint: Superheat and subcooling readings are within the manufacturer's specified range before the visit is closed.
- 5.8
Test controls and safety devices
HVAC TechnicianTechnician cycles the thermostat or building automation controls through heating and cooling modes and tests safety switches, such as high-pressure and low-pressure cutouts, for correct operation.
- 5.9
Inspect ductwork and condensate drainage
HVAC TechnicianTechnician checks accessible ductwork for leaks or disconnected sections, and confirms the condensate drain line and pan are clear and draining properly.
- 5.10
Record readings on the PM checklist
HVAC TechnicianTechnician records all readings, tasks completed and any components replaced on the PM checklist in the field service system.
- 5.11
Flag follow-up repairs with the customer
HVAC TechnicianTechnician explains any findings that need follow-up repair, such as a failing capacitor or worn bearing, to the facility contact and submits a repair recommendation for the service manager to quote.
- 5.12
Update equipment history and next due date
Service CoordinatorService coordinator updates the unit's equipment history with the completed PM and schedules the next visit based on the contract interval.
6.Quality checks
- โEvery PM checklist item has a recorded reading or a checked-off status, with no blank fields.
- โRefrigerant charge readings are within the manufacturer's specified range on every completed visit.
- โFollow-up repair recommendations are quoted to the customer within the agreed turnaround time.
- โA sample of completed PM visits is spot-checked by the service manager each month.
7.Records
- โCompleted PM checklist per unit and visit
- โEquipment service history log
- โRepair recommendation and quote log
- โAnnual PM contract schedule
8.KPIs
- โPercentage of scheduled PM visits completed on time
- โFollow-up repairs identified per PM visit
- โEmergency breakdown calls on units under a PM contract
- โCustomer contract renewal rate
9.Common mistakes
- โSkipping the electrical connection check because the unit sounds fine.
- โCleaning coils without checking fin condition and airflow afterward.
- โNot recording refrigerant readings, so drift over time goes unnoticed.
- โLeaving a failing part unreported because it is still working today.
- โForgetting to restore all panels and guards before leaving the site.
10.Revision history
| Revision | Date | Description | Reviewed by |
|---|---|---|---|
| 1.0 | September 15, 2026 | Initial release | Ilia Pirozhenko |
This is a template. Adapt it to your organization, equipment and local regulations before use.