- Owner
- Property Manager
- Effective date
- September 15, 2026
- Review cycle
- Every 12 months
1.Purpose
To turn a vacated unit around quickly and to a consistent make-ready standard, minimizing vacancy time while keeping the unit safe and presentable.
2.Scope
Applies to unit preparation between a tenant's move-out and the next tenant's move-in, including repairs, cleaning, and the make-ready inspection. Move-in and move-out procedures themselves are covered by separate SOPs.
Definitions
- Make-ready
- The status showing a unit has passed inspection and is ready to be shown or leased to a new tenant.
- Turn
- The full process of preparing a unit for a new tenant after the previous one moves out.
3.Responsibilities
- Property Manager
- Sets the turnover timeline, approves vendor costs, and signs off on the final make-ready inspection.
- Maintenance Technician
- Completes repairs, safety checks, and punch list items in the unit.
- Cleaning Contractor
- Performs the deep clean of the unit once repairs are complete.
RACI matrix
| Activity | Property Manager | Maintenance Technician | Cleaning Contractor |
|---|---|---|---|
| Inspect the vacated unit and scope work | I | R/A | - |
| Complete repairs and punch list items | I | R/A | - |
| Deep clean the unit | I | C | R/A |
| Run safety and system checks | I | R/A | - |
| Sign off on make-ready status | A | R | I |
R = Responsible, A = Accountable, C = Consulted, I = Informed
4.Materials and PPE
Materials, tools and systems
- โTurnover scope and punch list template
- โPaint, flooring and fixture stock
- โCleaning supplies and equipment
- โSmoke and carbon monoxide detector batteries
- โMake-ready inspection checklist
- โCamera or phone for before and after photos
Personal protective equipment
- โWork gloves
- โDust mask for sanding or painting
- โSafety glasses
5.Procedure
- 5.1
Inspect the vacated unit
Maintenance TechnicianWalk the unit as soon as it's vacated, photographing the overall condition and comparing it against the tenant's move-out inspection notes.
- 5.2
Build the turnover scope
Maintenance TechnicianList every repair, replacement, and cleaning task needed to bring the unit to make-ready standard, and estimate the time and cost for each.
- 5.3
Get approval for the turnover budget
Property ManagerSubmit the scope and estimated cost to the property manager for approval before ordering materials or scheduling contractors beyond routine repairs.
- 5.4
Complete repairs and punch list items
Maintenance TechnicianWork through the punch list in a logical order, such as ceiling and wall repairs before flooring and painting before final cleaning.
- 5.5
Test all appliances and systems
Maintenance TechnicianTest the HVAC system, water heater, plumbing fixtures, and all appliances for proper operation, and address anything that fails before the unit is shown.
Checkpoint: Every appliance and major system operates correctly when tested during the turnover.
- 5.6
Check and replace safety devices
Maintenance TechnicianTest smoke and carbon monoxide detectors, replace batteries, and confirm fire extinguishers and any required safety signage are present and current.
Warning: Never leave a unit make-ready with a smoke or carbon monoxide detector that fails its test.
- 5.7
Repaint and refresh finishes
Maintenance TechnicianPatch and repaint walls where needed, and refresh worn finishes like cabinet hardware or caulking to a presentable, consistent standard.
- 5.8
Deep clean the entire unit
Cleaning ContractorDeep clean every room, including inside appliances, cabinets, and closets, once repairs and painting are finished so dust and debris are fully removed.
- 5.9
Change or rekey the locks
Maintenance TechnicianChange or rekey exterior locks and reset any electronic access codes so the previous tenant's keys or codes no longer work.
Checkpoint: Locks or access codes are changed for every turnover before the unit is marked make-ready.
- 5.10
Run the make-ready inspection
Maintenance TechnicianWalk the finished unit against the make-ready checklist, photographing each room, and note any remaining item that needs to be fixed before approval.
- 5.11
Sign off on make-ready status
Property ManagerReview the completed checklist and photos, and mark the unit make-ready in the property management software so it can be listed and shown.
6.Quality checks
- โEvery turnover has a documented punch list closed out before make-ready sign-off.
- โSmoke and carbon monoxide detectors test working before the unit is marked make-ready.
- โLocks or access codes are changed on every turnover.
- โMake-ready photos show a fully cleaned, repaired unit matching the checklist.
7.Records
- โTurnover scope and punch list
- โMake-ready inspection checklist with photos
- โVendor and material cost approvals
- โLock rekey or access change log
8.KPIs
- โAverage days from move-out to make-ready
- โTurnover cost per unit
- โPercentage of turnovers completed without a callback repair
9.Common mistakes
- โMarking a unit make-ready before testing all appliances and systems.
- โForgetting to rekey locks or reset access codes after the previous tenant moves out.
- โPainting or cleaning before repairs are finished, causing rework.
- โSkipping the smoke and carbon monoxide detector test.
10.Revision history
| Revision | Date | Description | Reviewed by |
|---|---|---|---|
| 1.0 | September 15, 2026 | Initial release | Alexa Uskova |
This is a template. Adapt it to your organization, equipment and local regulations before use.