- Owner
- Excavation Competent Person
- Effective date
- September 15, 2026
- Review cycle
- Every 12 months
1.Purpose
To prevent cave-ins, utility strikes and falls by requiring a permit, a protective system and a competent-person inspection before anyone enters an excavation or trench.
2.Scope
Applies to all excavation and trenching work on the construction site, including utility trenches, foundation excavations and pits of any depth requiring worker entry.
Definitions
- Competent person
- A person trained and authorized to classify soil, select protective systems and inspect excavations, and who can stop work if a hazard is identified.
- Protective system
- Sloping, benching, shoring or a shield (trench box) used to protect workers from a cave-in.
- Spoil pile
- Excavated soil or material stacked beside the excavation, which must be set back from the edge.
- Utility locate
- The process of marking or confirming the position of underground utilities before digging begins.
3.Responsibilities
- Excavation Competent Person
- Classifies soil, selects the protective system, inspects the excavation daily and can stop entry if conditions are unsafe.
- Equipment Operator
- Operates excavation machinery, follows the competent person's instructions and watches for utility markers and spotters.
- Laborer
- Works in or near the excavation following the protective system and access rules, and reports hazards immediately.
- Site Supervisor
- Confirms the permit is in place, coordinates utility locates and enforces the exclusion zone around the excavation.
RACI matrix
| Activity | Excavation Competent Person | Equipment Operator | Laborer | Site Supervisor |
|---|---|---|---|---|
| Obtain permit and utility locates | C | I | I | R/A |
| Classify soil and select protective system | R/A | I | I | C |
| Inspect excavation before entry each day | R/A | I | I | I |
| Maintain barricades and signage | C | - | R | A |
| Stop work if a hazard is found | R/A | R | R | A |
R = Responsible, A = Accountable, C = Consulted, I = Informed
4.Materials and PPE
Materials, tools and systems
- โExcavation permit form
- โUtility locate request and markings
- โProtective system: shoring, trench box or sloping equipment
- โLadder or ramp rated for safe access and egress
- โBarricades, fencing and warning signage
- โAtmospheric gas monitor for deep or confined excavations
- โDaily excavation inspection log
Personal protective equipment
- โHard hat
- โHigh-visibility vest
- โSafety boots with toe protection
- โSafety glasses
- โGloves
5.Procedure
- 5.1
Request the excavation permit
Site SupervisorThe site supervisor requests an excavation permit before any digging starts, describing the location, depth and duration of the planned work.
- 5.2
Complete utility locates
Site SupervisorRequest underground utility locates and confirm all marked utilities are identified and, where required, verified by hand digging or another safe method before machine excavation begins.
Warning: Never excavate near an unmarked or unconfirmed utility line.
- 5.3
Classify the soil and choose a protective system
Excavation Competent PersonThe competent person classifies the soil type and selects sloping, benching, shoring or a shield sized for the depth and conditions, following the manufacturer's tabulated data or a registered engineer's design.
- 5.4
Set up barricades and signage
LaborerInstall barricades, fencing and warning signs around the full perimeter of the excavation before it is left open or unattended, including at night.
- 5.5
Position spoil and equipment safely
Equipment OperatorPlace excavated spoil, materials and equipment back from the edge of the excavation by the setback distance required by the protective system design or local regulations.
- 5.6
Provide safe access and egress
Excavation Competent PersonInstall a ladder, ramp or stairway within the excavation so that no worker has to travel an excessive lateral distance to exit, positioned within the protected zone.
- 5.7
Test the atmosphere in deep excavations
Excavation Competent PersonFor deep or confined excavations, test the atmosphere for oxygen level and hazardous gases with a calibrated monitor before entry and at intervals during the work.
- 5.8
Inspect before entry each day
Excavation Competent PersonThe competent person inspects the excavation, protective system, access and surrounding ground at the start of each shift and after any rainfall, vibration or other event that could increase hazards.
Checkpoint: No worker enters the excavation until the competent person has signed off that day's inspection.
- 5.9
Work within the protective system
LaborerWorkers stay within the sloped, benched or shielded area at all times while in the excavation, and do not work under suspended loads or unsupported sections.
- 5.10
Stop work if conditions change
LaborerAnyone who notices water accumulation, cracking, slumping soil or an unexpected utility must stop work, exit the excavation and notify the competent person immediately.
Checkpoint: Work stops immediately if any sign of instability is observed.
- 5.11
Backfill and reinstate
Equipment OperatorBackfill the excavation in the sequence and compaction specified in the design, removing the protective system in a controlled manner as backfilling progresses.
- 5.12
Close out the permit
Site SupervisorConfirm the excavation is backfilled, barricades removed and the area reinstated, then sign off and file the completed excavation permit and inspection log.
6.Quality checks
- โNo excavation permit is issued without confirmed utility locates on file.
- โEvery excavation has a documented soil classification and matching protective system.
- โDaily inspection log entries exist for every day the excavation remained open.
- โSpoil and equipment are kept back from the edge by the required setback distance.
7.Records
- โExcavation permit
- โUtility locate confirmation
- โDaily excavation inspection log
- โSoil classification and protective system design
8.KPIs
- โPercentage of excavations with a same-day inspection log entry
- โNumber of stop-work events related to excavation hazards
- โUtility strikes per year
9.Common mistakes
- โEntering an excavation before the competent person's daily inspection.
- โPiling spoil or parking equipment too close to the excavation edge.
- โSkipping a protective system for a trench assumed to be shallow enough.
- โNot re-inspecting after rain or nearby vibration from equipment.
10.Revision history
| Revision | Date | Description | Reviewed by |
|---|---|---|---|
| 1.0 | September 15, 2026 | Initial release | Ilia Pirozhenko |
This is a template. Adapt it to your organization, equipment and local regulations before use.