SOP templatesMaintenance

Fire Extinguisher Inspection SOP Template

An SOP for the monthly visual inspection of portable fire extinguishers and tracking their annual maintenance, so every extinguisher is in place, charged and ready to use.

FreeNo sign-upWord, PDF, Excel & CSV
Ilia PirozhenkoReviewed by Ilia Pirozhenko, Founder, Perfect WikiUpdated September 15, 202612 steps4 roles3 min read
Standard operating procedureSOP-MNT-008 ยท Rev 1.0
Owner
Maintenance Manager
Effective date
September 15, 2026
Review cycle
Every 12 months

1.Purpose

To make sure every portable fire extinguisher on site is present, unobstructed, fully charged and in serviceable condition, and that annual maintenance and testing are tracked and completed on schedule.

2.Scope

Applies to portable fire extinguishers in facility and production areas, covering the monthly visual inspection and coordination of annual maintenance. Fixed fire suppression systems are covered by a separate procedure.

Definitions

Inspection tag
The tag attached to an extinguisher used to record the date and initials of each monthly check.
Hydrostatic testing
A periodic pressure test some extinguisher types require to verify the cylinder can safely hold pressure.
Out-of-service
An extinguisher removed from its location because it failed inspection, and replaced with a temporary unit until repaired or recharged.
Extinguisher location map
The site diagram showing where each extinguisher should be mounted, used to confirm none are missing.

3.Responsibilities

Maintenance Technician
Performs the monthly visual inspection of each extinguisher and records the results on the tag and in the log.
Safety Coordinator
Maintains the extinguisher location map, reviews inspection completion, and coordinates employee training.
Maintenance Manager
Schedules annual maintenance and hydrostatic testing with a licensed contractor and approves replacement units.
Fire Protection Contractor
Performs annual maintenance, recharging and hydrostatic testing per the manufacturer's requirements.

RACI matrix

ActivityMaintenance TechnicianSafety CoordinatorMaintenance ManagerFire Protection Contractor
Perform the monthly visual inspectionR/AII-
Tag and replace a failed extinguisherRAIC
Schedule annual maintenance and testingICR/AR
Train employees on extinguisher useCR/AI-

R = Responsible, A = Accountable, C = Consulted, I = Informed

4.Materials and PPE

Materials, tools and systems

  • โ†’Extinguisher location map
  • โ†’Inspection tags and log sheet or CMMS
  • โ†’Extinguisher weighing scale for CO2 units
  • โ†’Replacement and loaner extinguishers
  • โ†’Manufacturer inspection guidance

Personal protective equipment

  • โ†’Gloves when handling extinguishers

5.Procedure

  1. 5.1

    Review the extinguisher location map

    Maintenance Technician

    Technician reviews the current extinguisher location map and the list of units due for a monthly check before starting the inspection route.

  2. 5.2

    Confirm the extinguisher is in its assigned location

    Maintenance Technician

    Technician confirms each extinguisher is mounted in its marked location, visible, and not blocked by equipment, storage or furniture.

    Checkpoint: Every extinguisher on the location map is accounted for and unobstructed.

  3. 5.3

    Check the pressure gauge

    Maintenance Technician

    Technician checks that the pressure gauge needle is in the operable green zone, not in the recharge or overcharge range.

  4. 5.4

    Inspect for physical damage

    Maintenance Technician

    Technician inspects the cylinder, hose and nozzle for corrosion, dents, cracks or a missing safety pin and tamper seal.

    Warning: Tag out of service and replace immediately any extinguisher with visible corrosion, dents or a missing safety pin.

  5. 5.5

    Weigh CO2 extinguishers where required

    Maintenance Technician

    Technician weighs CO2 extinguishers per the manufacturer's instructions and compares the reading to the full-charge weight stamped on the cylinder.

  6. 5.6

    Record the monthly check on the tag

    Maintenance Technician

    Technician records the inspection date and their initials on the extinguisher's inspection tag and in the log or CMMS.

  7. 5.7

    Tag out and replace a failed extinguisher

    Maintenance Technician

    Technician removes any extinguisher that fails inspection from service, tags it clearly, and installs a temporary replacement in the same location.

  8. 5.8

    Send failed units for recharge or replacement

    Safety Coordinator

    Safety coordinator arranges for out-of-service extinguishers to be recharged or replaced by the fire protection contractor promptly.

  9. 5.9

    Schedule annual maintenance

    Maintenance Manager

    Maintenance manager schedules the licensed fire protection contractor to perform annual maintenance on every extinguisher per the manufacturer's requirements.

  10. 5.10

    Schedule hydrostatic testing when due

    Maintenance Manager

    Maintenance manager tracks which extinguisher types are due for hydrostatic testing based on their cylinder date and schedules it with the contractor.

    Checkpoint: No extinguisher remains in service past its due date for hydrostatic testing.

  11. 5.11

    Update the inspection log

    Safety Coordinator

    Safety coordinator reviews the monthly inspection log for completeness and confirms every extinguisher on the map was checked.

  12. 5.12

    Train employees on locations and use

    Safety Coordinator

    Safety coordinator conducts periodic training so employees know the nearest extinguisher location and how to use it safely.

6.Quality checks

  • โ†’Every extinguisher on the location map has a current month's inspection tag entry.
  • โ†’No extinguisher is found with a pressure gauge outside the operable range for more than one inspection cycle.
  • โ†’Annual maintenance is completed for 100 percent of extinguishers before their due date.
  • โ†’Out-of-service extinguishers are replaced with a temporary unit the same day they are removed.

7.Records

  • โ†’Monthly inspection tags and log or CMMS entries
  • โ†’Annual maintenance and hydrostatic testing records from the contractor
  • โ†’Out-of-service and replacement log
  • โ†’Employee training attendance records

8.KPIs

  • โ†’Monthly inspection completion rate
  • โ†’Extinguishers failing inspection per period
  • โ†’Percentage of annual maintenance completed on time
  • โ†’Time to replace an out-of-service extinguisher

9.Common mistakes

  • โ†’Signing the inspection tag without actually checking the gauge and physical condition.
  • โ†’Leaving an extinguisher blocked by stored materials.
  • โ†’Not replacing an out-of-service extinguisher with a temporary unit right away.
  • โ†’Missing the hydrostatic testing due date because it isn't tracked separately from annual maintenance.
  • โ†’Skipping the monthly check on extinguishers in rarely visited areas.

10.Revision history

RevisionDateDescriptionReviewed by
1.0September 15, 2026Initial releaseIlia Pirozhenko

This is a template. Adapt it to your organization, equipment and local regulations before use.

Ask this SOP

Nobody opens a PDF in the middle of a task. They ask.

Add this SOP to Perfect Wiki and your team gets answers in the chat app they already use, with a link to the exact step. Ask from ChatGPT, Claude or Copilot too.

Perfect Wiki AIExample answer

I found an extinguisher with the pressure gauge needle in the red zone, what do I do?

Tag it out of service immediately, install a temporary replacement extinguisher in the same location, and notify the safety coordinator so it can be sent for recharge or replacement.Source: step 5.7 ยท Tag out and replace a failed extinguisher
Ask your own question about this SOPโ€ฆSign up to keep asking
Word file vs Perfect Wiki

A downloaded SOP starts going out of date the day you save it.

Screen recorders like Scribe and Tango capture clicks. Perfect Wiki holds the whole procedure, including your recorded guides, and answers questions about it.

Word or PDFPerfect Wiki
Finding itDig through folders and email threadsAsk in Teams, Slack, kChat or Mattermost
Keeping it currentEmail a new version and hopeEdit once with AI, everyone sees the update
Everything in one placeText and imagesEmbed Scribe and Tango guides, SharePoint files and videos
Who can change itAnyone with the fileEditors you choose, everyone else reads
Common questions

Frequently asked questions

Didn't find what you're looking for? Contact our support โ†’

Your SOP library

Keep every SOP where your team can ask it.

Perfect Wiki is the knowledge base for Microsoft Teams, Slack, kChat and Mattermost. Store your SOPs, embed your Scribe and Tango guides, and let AI answer questions with a link to the right step.

No credit cardSetup in under 10 minutesCancel anytime