- Owner
- Production Manager
- Effective date
- September 15, 2026
- Review cycle
- Every 12 months
1.Purpose
To make sure every assembly station is built to the same standard work instruction, defects are caught at the station where they occur, and the line runs at a steady, predictable pace.
2.Scope
Applies to manual and semi-automated assembly line stations building a product from staged components. Machine changeover and standalone equipment cleaning are covered by separate SOPs.
Definitions
- Standard work instruction
- The documented sequence of motions and checks an operator follows to build a station's assigned content the same way every time.
- Poka-yoke
- A mistake-proofing device or check built into a station that prevents or immediately catches an assembly error.
- Bill of materials (BOM)
- The list of components and quantities required to build a unit at a given station.
- Line clearance
- The end-of-shift check confirming no parts, tools or documents from one build remain at a station before the next shift or job starts.
3.Responsibilities
- Assembly Operator
- Builds each unit to the standard work instruction, performs in-station checks, and reports defects immediately.
- Line Lead
- Monitors line pace, responds to stoppage calls, and manages station rotation.
- Quality Inspector
- Audits in-station quality checks and investigates recurring station defects.
- Production Supervisor
- Tracks production count and scrap, and oversees end-of-shift line clearance.
RACI matrix
| Activity | Assembly Operator | Line Lead | Quality Inspector | Production Supervisor |
|---|---|---|---|---|
| Verify components against the bill of materials | R/A | I | I | - |
| Perform the assembly and in-station check | R/A | I | C | - |
| Respond to a line stoppage call | R | R/A | C | I |
| Track production count and scrap | R | R | I | A |
| Perform end-of-shift line clearance | R | R | I | A |
R = Responsible, A = Accountable, C = Consulted, I = Informed
4.Materials and PPE
Materials, tools and systems
- โStandard work instruction per station
- โBill of materials for the build
- โTorque tools and fixtures calibrated to specification
- โPoka-yoke or in-station check gauges
- โKanban or supermarket replenishment cards
- โProduction count and scrap tracking sheet
Personal protective equipment
- โSafety glasses
- โCut-resistant gloves where required
- โStatic-control wrist strap for electronics stations
- โHearing protection near powered tools
5.Procedure
- 5.1
Review the build schedule and work instruction
Assembly OperatorOperator reviews the day's build schedule and the current standard work instruction posted at the station before starting the shift.
- 5.2
Perform station safety check and don PPE
Assembly OperatorOperator checks that guards, light curtains and tool safety features at the station are in place and puts on the PPE required for that station.
- 5.3
Verify components against the bill of materials
Assembly OperatorOperator confirms the components staged at the station match the bill of materials for the unit being built, checking part numbers on new or changed builds.
Checkpoint: Staged components match the bill of materials before the first unit of a new build is started.
- 5.4
Perform the assembly operation
Assembly OperatorOperator builds the assigned content at the station following the sequence and technique specified in the standard work instruction.
- 5.5
Apply torque to specification
Assembly OperatorOperator uses the calibrated torque tool set to the specified value for each fastener called out in the work instruction, rather than tightening by feel.
Warning: Never substitute a non-calibrated tool or tighten fasteners by feel where a torque specification is called out.
- 5.6
Perform the in-station quality check
Assembly OperatorOperator performs the poka-yoke or visual check assigned to the station before releasing the unit, confirming the specific feature the check is designed to catch.
- 5.7
Pass the unit to the next station
Assembly OperatorOperator places the completed unit on the conveyor or in the buffer for the next station, following the line's takt time.
- 5.8
Report defects and stoppages immediately
Line LeadOperator calls the line lead immediately using the andon signal or call system if a defect, missing component or equipment issue is found, rather than working around it.
Checkpoint: Line lead responds to a stoppage call within the target response time.
- 5.9
Rotate stations per the job rotation plan
Line LeadLine lead rotates operators between stations at the scheduled interval per the job rotation plan to reduce repetitive strain and cross-train the team.
- 5.10
Replenish component bins
Assembly OperatorOperator or material handler replenishes component bins from the supermarket using the kanban card system when a bin reaches its trigger level.
- 5.11
Track production count and scrap
Production SupervisorOperator logs completed units and any scrapped parts on the tracking sheet or system throughout the shift.
- 5.12
Perform end-of-shift line clearance
Line LeadOperator and line lead clear the station of parts, tools and documents from the completed build before the next shift or a different job starts.
6.Quality checks
- โIn-station quality checks are performed on every unit, not sampled.
- โTorque tools used on the line are within their current calibration date.
- โLine stoppage calls are responded to within the target response time.
- โEnd-of-shift line clearance confirms no parts or documents from the completed build remain at the station.
7.Records
- โStandard work instructions per station
- โProduction count and scrap tracking sheet
- โLine stoppage and response log
- โLine clearance checklist
8.KPIs
- โFirst-pass yield at final assembly
- โLine stoppage response time
- โUnits per hour against takt time target
- โScrap rate per shift
9.Common mistakes
- โSkipping the in-station check when the line is running behind schedule.
- โTightening fasteners by feel instead of using the calibrated torque tool.
- โWorking around a missing component instead of calling a line stoppage.
- โLeaving parts or documents from the previous build at the station during line clearance.
- โNot verifying components against the bill of materials on a new build.
10.Revision history
| Revision | Date | Description | Reviewed by |
|---|---|---|---|
| 1.0 | September 15, 2026 | Initial release | Ilia Pirozhenko |
This is a template. Adapt it to your organization, equipment and local regulations before use.