- Owner
- Quality Manager
- Effective date
- September 15, 2026
- Review cycle
- Every 12 months
1.Purpose
To make sure production parts are measured against specification at the right frequency and stage, out-of-spec conditions are caught early, and only conforming product is released to the next process or customer.
2.Scope
Applies to first article, in-process and final inspection of manufactured parts on the production floor. Disposition of confirmed nonconforming product is covered by a separate SOP.
Definitions
- First article inspection
- The inspection of the first part produced after a job start or changeover, before the rest of the run continues.
- AQL
- Acceptable quality level. The sampling plan used to decide how many parts to check based on lot size and quality history.
- Control plan
- The document listing which characteristics of a part must be inspected, at what frequency, and with what method.
- Gauge R&R
- A study that checks whether a measurement system gives consistent, repeatable results across operators and gauges.
3.Responsibilities
- Quality Inspector
- Performs sampling and measurement per the control plan, records results, and flags out-of-spec conditions.
- Production Operator
- Runs in-process checks between inspector visits and stops the line if parts are clearly out of spec.
- Quality Manager
- Owns the control plan and sampling plans, reviews trends, and manages the calibration and gauge R&R program.
- Production Supervisor
- Coordinates line stoppages for quality issues and confirms corrective actions are followed on the floor.
RACI matrix
| Activity | Quality Inspector | Production Operator | Quality Manager | Production Supervisor |
|---|---|---|---|---|
| Maintain the control plan and sampling frequency | C | I | R/A | I |
| Perform first article inspection | R/A | C | I | I |
| Perform in-process inspections | R/A | R | I | I |
| Quarantine and tag out-of-spec parts | R/A | R | I | C |
| Release the lot for shipment or next process | R | I | A | I |
R = Responsible, A = Accountable, C = Consulted, I = Informed
4.Materials and PPE
Materials, tools and systems
- โControl plan and inspection specification for the part
- โCalibrated measurement tools (calipers, gauges, torque testers)
- โStatistical process control (SPC) record or software
- โAQL sampling plan tables
- โQuarantine tags and hold area
- โFirst article inspection form
Personal protective equipment
- โSafety glasses
- โGloves appropriate to the part material
- โHearing protection near running equipment
5.Procedure
- 5.1
Review the control plan for the part
Quality InspectorInspector reviews the control plan for the part number running, confirming which characteristics to check, the method, and the required sampling frequency.
- 5.2
Verify measurement equipment
Quality InspectorInspector confirms the gauges and tools needed are within their current calibration date before taking any measurement.
Checkpoint: All measurement tools used are within their current calibration date.
- 5.3
Perform first article inspection
Quality InspectorAt job start or after a changeover, inspector measures the first part produced against every characteristic on the control plan before the operator continues the run.
Checkpoint: First article passes every control plan characteristic before the run continues past the first part.
- 5.4
Pull the sample per the sampling plan
Quality InspectorInspector pulls parts from the run at the interval specified in the AQL sampling plan for the current lot size.
- 5.5
Perform in-process inspections
Production OperatorInspector measures the sampled parts against specification at the defined interval throughout the run, and the operator performs any assigned in-process self-checks between inspector visits.
- 5.6
Record measurements on the SPC record
Quality InspectorInspector records every measurement on the SPC record or inspection log, not just a pass or fail result, so trends can be tracked over time.
- 5.7
Compare results to specification limits
Quality InspectorInspector compares each result to the specification limits and control limits on the SPC chart, watching for trends approaching the limit even if individual parts still pass.
- 5.8
Quarantine and tag nonconforming parts
Quality InspectorWhen a part fails inspection, the inspector stops the affected process, tags the suspect parts, and moves them to the quarantine area for disposition under the nonconforming product procedure.
Warning: Do not allow suspect parts to continue to the next process or be mixed with conforming stock.
- 5.9
Notify the supervisor of an out-of-spec trend
Production SupervisorInspector notifies the production supervisor immediately when a trend or failure indicates a process issue, so the line can be paused if needed.
- 5.10
Perform final inspection before packaging
Quality InspectorInspector performs a final inspection on the completed lot against the control plan before it is packaged or moved to the next process.
- 5.11
Complete records and release the lot
Quality ManagerInspector completes the lot's inspection records and the quality manager reviews and releases the lot for shipment or the next process step.
- 5.12
Participate in gauge R&R and calibration audits
Quality ManagerQuality manager schedules periodic gauge R&R studies and calibration audits for the measurement tools used in inspection, and inspectors participate as scheduled.
6.Quality checks
- โFirst article inspection is completed and passed before any run continues past the first part.
- โEvery measurement tool used is within its current calibration date.
- โSampling frequency on the floor matches the control plan for each part number.
- โSPC records show individual measurements, not only pass/fail results.
7.Records
- โSPC records and inspection logs
- โFirst article inspection forms
- โCalibration and gauge R&R records
- โQuarantine and hold tags
8.KPIs
- โFirst-pass yield
- โDefects found per lot inspected
- โPercentage of inspections completed at the required sampling frequency
- โCalibration compliance rate
9.Common mistakes
- โSkipping first article inspection to save time after a fast changeover.
- โRecording only pass or fail instead of the actual measurement, hiding trends.
- โContinuing to run parts after a failed sample while waiting for a decision.
- โUsing a gauge that is past its calibration due date.
- โMixing quarantined parts back into conforming stock before disposition.
10.Revision history
| Revision | Date | Description | Reviewed by |
|---|---|---|---|
| 1.0 | September 15, 2026 | Initial release | Ilia Pirozhenko |
This is a template. Adapt it to your organization, equipment and local regulations before use.