- Owner
- Safety Officer
- Effective date
- September 15, 2026
- Review cycle
- Every 12 months
1.Purpose
To find hazards before they cause an incident by scheduling regular, structured inspections of work areas, equipment and safety systems, and tracking corrective actions to closure.
2.Scope
Applies to all indoor and outdoor work areas, equipment and safety systems within the company's facilities, inspected on a schedule based on area risk level.
Definitions
- Inspection checklist
- A structured list of items to check during a safety inspection, tailored to the type of area being inspected.
- Corrective action
- A specific fix assigned to close out a hazard or deficiency found during an inspection.
3.Responsibilities
- Safety Officer
- Schedules inspections, prepares checklists, leads the walk-through and reports results to management.
- Supervisor
- Accompanies inspections in their area, provides context, and implements assigned corrective actions.
- Employee
- Raises hazards or concerns during the inspection and follows through on corrective actions affecting their work.
- Department Manager
- Reviews inspection results for their department and approves resources for corrective actions.
RACI matrix
| Activity | Safety Officer | Supervisor | Employee | Department Manager |
|---|---|---|---|---|
| Schedule and prepare the inspection | R/A | I | - | I |
| Walk the area against the checklist | R/A | R | C | I |
| Document and prioritize findings | R/A | C | - | I |
| Assign and complete corrective actions | A | R | C | C |
| Report inspection results to management | R/A | I | - | C |
R = Responsible, A = Accountable, C = Consulted, I = Informed
4.Materials and PPE
Materials, tools and systems
- โArea-specific inspection checklist
- โCamera or phone for documenting findings
- โInspection schedule by area and risk level
- โCorrective action tracking log
- โPrior inspection reports for comparison
Personal protective equipment
- โPPE appropriate to the area being inspected
5.Procedure
- 5.1
Schedule the inspection
Safety OfficerSet the inspection frequency for each area based on its risk level, and confirm the date on the inspection schedule with the area supervisor.
- 5.2
Prepare the checklist
Safety OfficerSelect or prepare the inspection checklist matching the type of area, such as an office, warehouse or production floor, and review the prior inspection's open items.
- 5.3
Walk the area systematically
Safety OfficerWalk the area following a consistent route, working through the checklist item by item rather than relying on memory alone.
- 5.4
Check housekeeping
Safety OfficerLook for clutter, spills, blocked walkways and improperly stored materials that could cause a slip, trip or fall.
- 5.5
Check fire safety and emergency exits
Safety OfficerConfirm fire extinguishers are in place and accessible, emergency exits are unlocked and unobstructed, and exit signage is visible and working.
Checkpoint: Every emergency exit checked is unlocked from the inside and free of obstruction.
- 5.6
Check machine guarding and lockout devices
Safety OfficerVerify machine guards are in place and functional, and that lockout and tagout devices are available and in good condition where required.
Warning: Never operate or approach a machine found with a missing or defeated guard. Report it immediately and remove the machine from service.
- 5.7
Check PPE availability and condition
Safety OfficerConfirm required PPE is available at the point of use, correctly stored, and free of visible damage, and observe whether employees are wearing it as required.
- 5.8
Check electrical equipment and cords
Safety OfficerInspect visible electrical panels, cords and equipment for damage, exposed wiring or improper extension cord use.
- 5.9
Talk with employees during the walk-through
EmployeeAsk employees working in the area if they have noticed any hazard or have a safety concern that might not be obvious from a visual check alone.
- 5.10
Document findings with photos
Safety OfficerRecord each finding on the checklist with a description and a photo where practical, so it can be verified once corrected.
- 5.11
Prioritize findings by severity
Safety OfficerRate each finding by how serious the hazard is and how likely it is to cause harm, so the most dangerous issues are corrected first.
- 5.12
Assign corrective actions
SupervisorAssign each finding a corrective action with a responsible owner and a due date matched to its severity rating.
- 5.13
Verify corrective actions are closed
Safety OfficerFollow up on each assigned corrective action and confirm it is completed and effective before marking the finding closed.
Checkpoint: Every corrective action is verified complete, not just marked as assigned, before the finding is closed.
- 5.14
Report results to management
Safety OfficerSummarize the inspection results, open items and trends across inspections, and report them to department managers and leadership.
6.Quality checks
- โEvery scheduled inspection is completed using the correct area checklist.
- โHigh-severity findings are corrected within a short, defined timeframe.
- โCorrective actions are verified complete, not just assigned, before being closed.
- โRepeat findings across inspections are flagged for a deeper root cause review.
7.Records
- โCompleted inspection checklists and photos
- โCorrective action tracking log
- โInspection summary reports to management
8.KPIs
- โPercentage of scheduled inspections completed on time
- โNumber of open corrective actions past their due date
- โNumber of repeat findings across consecutive inspections
9.Common mistakes
- โWalking through an area without following the checklist systematically.
- โMarking a corrective action closed without verifying it was actually completed.
- โNot talking to employees who work in the area during the inspection.
- โLetting high-severity findings sit open for weeks without a target date.
10.Revision history
| Revision | Date | Description | Reviewed by |
|---|---|---|---|
| 1.0 | September 15, 2026 | Initial release | Ilia Pirozhenko |
This is a template. Adapt it to your organization, equipment and local regulations before use.